Software Project Management Series (Session 7): Effective Project Scheduling Techniques and Best Practices

Read Transcriptions

Video length - 01:43:08

996 attendees

Conducted on - 15 Dec,2011

4860 views

About Speaker
Rajesh RaoProject Manager
Mr. Rajesh Rao is a result oriented, PMP professional with dedicated 6 years career in conceptualizing, recommending, planning and overseeing the delivery of innovative solutions to increase visibility of products a...
The Topic Covers General Project Scheduling techniques like Activity duration estimates, Sequencing activities by Precedency diagraming method [PDM approach], and Developing project schedule through Critical path method, critical chain method and PERT analysis. Also the discussion will involve topic on Scheduling with uncertain durations. The three disadvantages of PERT Analysis.  Key Takeaways:
  • Project Scope and relevancy of project scheduling
  • How to apply Precedency diagraming method and Dependency determination.
  • What is Critical Path method and Critical Chain method.
  • What are the Schedule compression tools
  • What are the three main disadvantages of PERT analysis
  • What is “what-if" problem solving?

  • Tags
    Project Management